WI-120 Machine Startup and First-Piece Approval
Revision E · Effective 2025-08-11
1 Purpose
This instruction defines how CNC machines are started up at the beginning of a shift or job, how the first piece of a setup is approved, and how in-process checks are performed so that nonconforming parts are caught before a production run continues.
2 Scope
Applies to all CNC mills, lathes and 5-axis/horizontal machining centers at the Wichita plant, including Bay 2 grinding and Bay 5 machining. It covers every job, with mandatory inspector verification before any production on flight hardware. First Article Inspection (FAI) to AS9102 is a separate requirement covered by QP-8.6 and WI-210; a first-piece approval does not replace an FAI.
3 Definitions
- Warm-up program: the 10-minute spindle and axis warm-up program WU-10, stored in the control of every CNC machine.
- First piece: the first part produced after a new setup, a program edit, a tool change that affects a characteristic, or a machine crash.
- Control plan: the job-specific inspection plan attached to the traveler, listing characteristics, gages and check frequency.
- Flight hardware: any part the traveler or PO identifies as installed on an aircraft, spacecraft or missile.
4 Responsibilities
- Operator: runs the warm-up, measures the first piece, records results on the traveler, performs in-process checks.
- Quality inspector: verifies the first piece and stamps the traveler with an issued inspection stamp (WI-410, F-410-03).
- Production Manager: ensures warm-up and first-piece time is planned into the schedule; never authorizes running production ahead of inspector verification.
- Manufacturing Engineer: maintains the control plan and the WU-10 program.
5 Procedure
5.1 Machine startup
- Confirm safety glasses with side shields and safety-toe shoes are worn (EHS-02). Do not wear gloves near rotating spindles.
- Check way-lube and coolant levels, air pressure, and that the work area is free of loose tools and debris (QP-7.7).
- Run WU-10 at the start of each shift and whenever the machine has been idle for more than 2 hours. Do not shorten or skip the 10-minute cycle.
- Confirm all gages to be used carry a green calibration label and are within their due date (QP-7.6). A yellow-label gage may only be used within the restriction written on its label.
5.2 Setup verification
- Verify the traveler, drawing revision and NC program revision match each other and the ERP job.
- Verify that tool offsets and work offsets have been set and recorded on the setup sheet.
- If the job is flagged "ITAR" on the traveler, keep the drawing at the machine and return it to the controlled location at end of shift (EXP-01).
5.3 First-piece check by the operator
- Run one part and measure 100% of the dimensional and visual characteristics listed on the control plan.
- Record actual values on the traveler, not just pass/fail.
- Deburr the part to WI-305 before visual evaluation.
- If any characteristic is out of tolerance, adjust and run another first piece. The rejected piece is red-tagged per WI-610.
5.4 Inspector verification
- The operator calls a Quality inspector, who independently re-measures the characteristics marked as key or critical on the control plan and reviews the operator's recorded results.
- When satisfied, the inspector stamps and dates the first-piece block on the traveler.
- Production on flight hardware must not start until the inspector stamp is on the traveler. There are no exceptions for rush orders or 2nd-shift staffing.
- If an FAI is required for the job (QP-8.6), the first piece is also sent to the Bay 4 metrology lab for CMM inspection per WI-210.
5.5 In-process checks
- Perform in-process checks at the frequency stated in the control plan.
- If the control plan does not specify a frequency, the default is every 10th part or once per hour, whichever is more frequent.
- Record each check on the traveler with part count, time and initials.
5.6 Failed in-process check
- Stop the machine immediately. Do not continue the run to "finish the bar" or the batch.
- Apply a red HOLD tag (F-750-04) to the failed part and to every part produced since the last good check, and quarantine them per WI-610.
- Notify the shift lead and Quality. Quality enters the NCR per QP-7.5.
- Do not restart until the cause is corrected and a new first piece has been approved per 5.3 and 5.4.
6 Records
The traveler, including first-piece results, inspector stamp and in-process check entries, is a quality record retained 10 years from creation per QP-4.2. NCRs generated under 5.6 are retained per QP-7.5.
7 Revision history
| Rev | Date | Change | Approved by |
|---|---|---|---|
| C | 2021-04-05 | Added control plan reference for in-process frequency | Ruth Okafor |
| D | 2023-06-12 | Added default in-process frequency (every 10th part or hourly) | Ruth Okafor |
| E | 2025-08-11 | Inspector verification made mandatory before production on flight hardware; WU-10 required after 2 hours idle | Ruth Okafor |